High wall formwork

For the construction of high walls that are poured in two or more stages, initially, the first stage is installed using bolt brackets (platforms) on the wall. Then concrete formwork concrete formwork is installed in its designated location, and leveling jacks are used for bracing and aligning the formwork, as shown in the diagram, over the brackets and soldiers.

After each stage of concrete pouring, the brackets are installed for the next formwork using a special bolt or anchor bolt designed for the next stage of formwork.

If the wall height is significant, it is not possible to pour concrete in a single stage. Therefore, we use a formwork system at height, and for pouring concrete at this stage, we need to utilize facilities to ensure the stability of the concrete formwork assembly.

By using brackets and their accessories (including inner bracket pins, conical brackets, bracket nuts, outer bracket pins, bracket wingnuts) as well as leveling jacks and concrete pouring platforms, the stability of the formwork system and the ease of concrete pouring at height can be ensured.

Brackets and leveling jacks are crucial components in the construction of tall walls, meaning walls that are 4 meters or higher in height, and where one-stage concrete pouring is not feasible. Brackets are manufactured in two types: tubular and profile, which differ in weight. Additionally, profile brackets are preferred for ease of use

It has a greater number.

High wall formwork

Tubular bracket (22 kilograms)

Bracket and its functioning in the formwork system:

When carrying out formwork operations in tall structures or projectsin the case of structures or projects where the concrete pouring operations are carried out in multiple stages, precautions must be taken for setting up the formwork at height. This task is performed by brackets within the formwork, which serve as temporary and stable platforms for formwork operations at elevation. In fact, the bracket is a triangular-shaped bottom piece and is used in the construction of tall walls. Also bracket can be considered as a part of the top-down wall formwork, responsible for the installation concrete metal formwork providing the proper position for formwork bracing, securing a refuge point for worker safety, attaching a hanging scaffold for access and work in the lower area bracket is responsible for it. bracket After completing each stage of the concrete structure, a bolt or anchor bolt is installed on the structure, and the formwork system, brackets, and lifelines are deployed on it. In this way, for the construction of a high wall, for example, reaching a height of 9 meters and having a formwork system up to this height 3 After executing the first stage of the wall, which covers 3 meters, and opening the concrete formworks, brackets are installed on the top of the wall in the designated holes for the bolts in the upper part of the first stage. Subsequently, the formwork system is deployed on it. To perform the concrete pouring and finishing operations, you can attach a drop head bracket and a suspended ledger. Suspended ledger provides workers with the ability to access the finished concrete surface at height without the need for scaffolding.

High wall formwork

Profile bracket (27 kilograms)

concrete formwork / Beam and slab formwork

since the formwork for concrete beams is similar to each other, but varies depending on the type of slab (ribbed, one-way, two-way, waffle slab, pre-tensioned, and precast), the formwork for slabs will also differ. In some cases, the shape of the capital and its concurrent execution with the concrete slab, as well as how it is connected to the beams, are critical factors in the formwork design. To execute the formwork of the beams, a single piece of concrete formwork is used on the bottom of the beam (bottom formwork), and two side concrete formworks (suspended forms) are utilized. Initially, the bottom formwork is placed on ceiling jacks or substructure girders, and then the side forms are connected to the bottom forms through punched corner joints. To ensure the internal and external stability of the beams, back supports (dastak) and intermediate bolts are used (for beams over 50 centimeters in height). The precise calculation of the length of concrete formwork components for the floor slab and hangers in the beam-column formwork depends on the formwork method. If the concrete formwork for the floor slab is constructed side by side with the column formwork or shaft beam, its length will be equal to the clear span of the beam. In case of overlap between the floor slab formwork and the thickness of the column formwork, the thickness of the column forms on both sides of the beam must be added to its clear span. This is done for ease of dismantling the concrete formwork. In beams, a type of metal formwork called “modular fillers” is used in the hanger and floor slab sections to facilitate the formwork assembly.

High wall formwork

Concrete formwork / Wall formwork